CleanBC Customs Program – Energy Study Incentive Stream
Receive up to $20,000 in Government Funding.
A key objective of CleanBC Custom Incentives – Energy Study Incentive Stream is to reduce GHG emissions from fuel-switching and other electrification measures (such as heat reclaim systems) that result in significant reductions in fossil fuel use in the future.
CleanBC Customs Program – Energy Study Incentive Stream
Amount of Funding
Access up to 50% of an energy study’s cost, up to a maximum of $20,000.
CleanBC Customs Program – Energy Study Incentive Stream
Eligible Applicants
A BC Hydro Key Account Manager (KAM) is assigned to the account. During the pre-screening phase, the project must demonstrate that it has the potential to implement measures at a single facility that will lead to at least 1,200 tC02e of reduction in lifetime energy consumption. There must be a building in the BC Hydro service territory, which includes New Westminster, to be eligible for this program.
In order for a project to qualify as an energy measure, it must meet the following criteria:
- Assist in reducing greenhouse gas emissions on a net basis;
- As a result, measurable and verifiable energy impacts can be achieved;
- It will result in energy impacts that can be estimated using standard engineering calculations as a result of the project; and
- Include a technology that is not included in other utility DSM programs, such as FortisBC’s Commercial Performance Program, which is not covered by other DSM programs.
The proposed projects must be based on proven technologies which are commercially available and have a reasonable rate of adoption in the marketplace. It is not possible to purchase equipment before the Capital Incentive Agreement has been finalized and signed.
CleanBC Customs Program – Energy Study Incentive Stream
Eligible Activities
- Demonstrate the potential to implement measures at a single facility that will lead to at least 1,200 tC02e of lifetime savings;
- Involve a technology that is not covered by other utility DSM programs;
- Involve a technology that must provide net electrical load growth2;
- Involve a technology that is accessible/viewable for site inspection and/or measurement & verification if required; and
- Be hardwired or permanent in nature.
CleanBC Customs Program – Energy Study Incentive Stream
Program Deadline
Applicants have 6 months from the date of the signed Energy Study Agreement to complete the energy study.